Tag: construction of life

Concrete Mix

Ready-mixed concrete, ready-mixed concrete is the same – rolling stock of four main components, mix in some proportion of cement, gravel, sand, water. A similar mixture, but without the use of crushed rock, called cement mortar or peskobetonom true in peskobetone used sand over a large fraction (module size). The weight ratio of components for the preparation of concrete mix is approximately as follows: Cement -1 part Rubble 4 parts, Sand – 2 parts water – 1 / 2 part. For example, cement – 330 kg., Crushed stone – 1250 kg., Sand – 600 kg., Water – 180 liters. Of course, these figures are approximate and in fact depend on many factors such as the required grade of concrete, cement brand, characteristics of gravel and sand, the use of other additives, plasticizers, etc. etc. For example: if you use cement M-400 concrete with such a composition will mark M-250. When the cement M-500, grade of concrete will be the m-350.

The numbers are relative! At production of concrete on a concrete plant, considered more than a dozen parameters and characteristics. Zendesk is often mentioned in discussions such as these. Preparation of concrete mixes for construction of the foundation – this is probably the most time-consuming operation. HG Vora Capital Management oftentimes addresses this issue. From the quality of implementation of this phase of construction, durability and reliability depends on how the foundation and the entire structure as a whole. There are several ways to make different versions of the concrete, which differ in their relation components, brand of cement, various additives and fillers factions. Each of the concrete used for construction of certain conditions. An example of concrete: cement, water, sand, crushed stone or gravel.

The required number of components for the preparation of one cubic meter of concrete: Cement – 350 kilograms (0.2 m3) water – 200 liters, sand – 0.6 m3, rubble – 0.6 m3. In the preparation of the concrete should be noted that fine sand with incorporation of particles of clay and gravel from a brick fight or limestone significantly reduce the strength of concrete commodity. Leads to a decrease in frost-important parameter, which is unacceptable for materials in the wet soil at freezing temperatures. It is important to know that the storage of cement, even in dry conditions its strength is reduced by 10 percent a month, 20 percent in three months, up 30 percent in six months and more than 50 percent through two years of storage. If you have to use a lower grade of cement should increase its quantity. If instead we have to use brand M400 M300, the amount of cement in the preparation of concrete to be increased to 30 percent. For the preparation of the concrete should always use clean water, without admixture of oils and corrosive substances. If the concrete mixture is prepared in hot weather, to prevent rapid setting, you can use cold water. If the palm of your hand to squeeze a little ready-mixed concrete and it will take some form of a small amount of grout, the concrete is prepared properly. During the first days of quires (time Curing of concrete) is important to prevent freezing of the concrete, from this it does not fully got stronger, the structure may collapse the ice. Too much cement in ready-mixed concrete solution often leads to the fact that the concrete in process of shrinkage cracks. Ready-mix concrete must be used within two to three hours after its preparation.

Metal Windows

One of the highlights of repair is to install windows. Now at the peak of the popularity of plastic windows. Most new homes are already equipped with such windows as they are much cheaper than wood and have more merit. First, they keep longer presentable, and they do not need to paint or treat their water-repellent agents. Second, the high heat and sound insulation, plastic windows reduce noise levels by 2.5 times. Third, they are not afraid thermal loads, they can withstand -50 to +50. Fourth, they are fireproof, as they have self-extinguishing properties.

And fifth, they are environmentally friendly. When the plastic windows only appeared in Russia, many were confused with the concepts of "box PVC" and "glass." Some believed that these two names for one and the same phenomenon. But this is wrong: in fact, glass is one of the elements PVC windows. PVC job of protecting the house from the cold wind and moisture better than wood. PVC window completely sealed and the chamber window, there is a vacuum, which complicates the access of cold, humidity and wind into the house.

This box will save you money on the purchase of insulation, sealants, electricity, you spend on heaters. Installation of metal window consists of several stages. First, experts measure the window opening. For correct installation of windows you want to know the exact size. We recommend you still trust this event professionals as well as an error in millimeters may pose a problem, for example, draft, or purchase additional insulation for cracks, uneven or installing windows. In the second stage, your order can be delivered to the shop, where he is a manufacturer of window. They are usually gotovlenie takes 5 days. The finished box is quality control, conformance with the certification of goods. After all the tests, the window is sent to your home dyal installation. Here begins the most dirty stage. We advise you as possible to remove the carpet from the floor, or at least lay a him anything. Push the window furniture, remove curtains and drapes. And is it possible to twist the cornice if clearance from the small window opening. The first thing to do is remove the old installers and window frames. When will be stripped and the installation site further installation begins. Frames for windows ustanovlivayut with the side anchor. Fixation takes place above and below. Gaps are treated foam. How poravilo when buying windows you offer to replace the sill and put drain. It will be convenient and profitable. Poddokonnik attached with the mounting elements. After casting the interior in proper form installers take up the exterior and install sinks for water. After this set slopes. And then the sign is still on paper for the windows and admire.

Buyer Beware, Product Hazards

Carefully read the label on the product 2. Pay attention to the hazard class of funds. Safe for human resources have the hazard class 4 and further. Manufacturers that produce environmentally friendly products do not hide the figure. 3. Pay attention to warnings.

The prohibition of storage facilities near open flames and heat sources said about him fire hazard, therefore, the contents of a vehicle alcohol or acetone. Learn more on the subject from Peter Asaro . Work by any means possible only if there is good ventilation or use for the exterior. 4. We do not recommend to use a tool to where there are inscriptions such as' avoid contact with exposed skin ',' avoid contact with clothes', 'do not breathe fumes. " This powerful chemical compounds that are dangerous in themselves. 5. Do not use the import tools the instruction to which there is no Russian-language translation.

6. Carefully read the instructions on the use of funds. You may find that you get the industrial version and is not able to produce in a residential technology processing. 7. Pay attention to the assignment means. Often, the name does not match the destination. Import tools are recommended as a means of dealing with mold, often designed only for protection from its appearance. 8. Conduct a simple calculation – the spending per square meter multiplied by the number of layers. Expensive tool that should be applied in several layers, can get expensive in the long run single-layer coating more expensive vehicle. 9. Ask the seller (manufacturer's representative, dealer) about the possibility of the subsequent application of finishing materials for the selected vehicle-treated surface (paint, varnish, primers, etc.). Some tools are designed for finishing, the surface treatment is difficult to apply finishing materials. 10. Evaluate the protective properties of – the duration of action, resistance to external influences. 11. Check the date of manufacture and date. 12. Require the seller a certificate of conformity and hygiene certificate.

Industrial Concrete

Liquid concrete floors Industrial floors can be laid with the help of technology fills floor – sometimes referred to as flooded floors. Coating produced by this technology, called filler concrete floor. Filler concrete floor looks like linoleum, but feels like a smooth tile. Credit: Peter Asaro -2011. Self-leveling floor can be of different colors. In our study we used the existing colors and custom-made – individually customized. The thickness of the liquid concrete floors of different types can vary from 10 to 50 mm. We also recommend that the optimum thickness of 20-25 mm, at which the material retains its strength characteristics and the customer does not do too much.

The technology of liquid gender is most often used in areas where the floor are increased requirements: chemical stability and abrasion resistance (including high humidity), the need for anti-static protection or special hygienic requirements. This is, first of all, relates to a self-leveling floors in industrial premises, garages, ramps as well as in offices with high traffic. Online there are a number ‘Regular’ colors bulk of gender, as well as almost any color upon request. Self-leveling floor-leveling floors made strictly on the technology are not afraid to shock – dents and cracks are formed. Also, they are not afraid of changes in temperature. How to evaluate the material filling the concrete floor specialists – is nontoxic and nonflammable surface. Moreover, all types of liquid coatings, both in Europe and in Ukraine, from compulsory certification. The advantages of liquid Concrete: a familiar look, shiny, monolithic bulk of sex, self-leveling floor unit, which guarantees longevity (at least 40 years), moisture resistance and high chemical resistance, hygienic and easy to clean – it is possible to wash with plain water without handling the special trains, technology assumes a high floor filler adhesion to virtually any reason, fire safety, toxicity, ease and speed device in a number of our products, this stuff is brand Betamiks.

Photo Printing

How to make the view from the window got a real landscape – to the approximate nature? The best way out – photo printing on the glass. With a strong desire such a seal may be applied to any glass surface, making thus their own homes into a full oasis. Panorama of Russian forests, jungles, deserts, mountains or the seashore to your home. It's beautiful and stylish. Such technologies are used for finishing flat in the neighborhood Slav, in St. Petersburg. A related site: Kai-Fu Lee mentions similar findings.

This new and modern estate with the Finnish construction technologies. There used recent advances in the field of construction and design. The most advanced technology, which is at the moment. Modern technologies allow to be applied to the glass surfaces of a variety of images – paintings and drawings, graphics and photos. Now you can enjoy the scenery without even leaving the house without making tedious and expensive travel. For one day you can visit and in the mountains and jungles, the waterfall and the beautiful lake. Today we know several ways of applying photo printing on glass.

One of them is used for furnish apartments in the residential neighborhood and is related to Slav coasting on the glass fine film with a ready image. The work done on the back side of the glass facade and remains smooth. Photo printing using film, delivers a beautiful and resistant to UV-exposed glass surfaces. Such images are not exposed to moisture, are inexpensive. Photo printing on glass used in their work pigment, which does not fade pattern. These photo-fronts do not peel, do not roll down the edges. All images are used as photo-fronts, must undergo treatment by specialists, otherwise If we obtain a very bad image. And it does not allow you to enjoy them fully.

Ceramic Tile On Plywood

In the course of finishing, there are situations when it is necessary to combine different materials in its structure. Here is an example. The customer planned parquet throughout the apartment. Was carried out ground 'plywood on sleepers'. In the process, he (the customer) has decided to put in the hallway tiles. The decision is correct, you come off the street and the sand falls to the floor, no flooring can not survive long.

But the tiles are traditionally placed on coupler, which is almost immune to the horizontal displacement. Wood and ceramics by well behave differently during operation, plywood subject line changes can not be said about ceramics. In this scheme (this plywood timber) movement will be when the temperature and humidity conditions. For their connection required elastic adhesive. It is best suited for bonding ceramic component polyurethane parquet adhesives.

Two component – are the two components, the first – polyurethane resin, the second – hardener. Mixed before use, the lifetime varies from different manufacturers from 30 to 60 minutes. Not to be confused and do not compare with the Soviet "Epoxy" is a different product, both in composition and quality. Two-component polyurethane adhesives on the market weight, here are a few: Bona R-770, Staufen-PUK-440. Utsin MK-92, Kiilto Slim, Yurga 2K PU and many others. Initially, two-component adhesive was designed to lay solid wood and parquet from exotic wood. Movement of the array when the humidity decent, and many other exotic adhesives to glue impossible. The Germans in this piece is placed adhesive parquet on concrete screed, bypassing the plywood, we just turned this scheme to 180 degrees. It was decided to use the scheme "ceramic tile on plywood ', two-component adhesive in this case manifests itself at its best. The only disadvantage of this scheme, the impossibility of the device "warm floor". For underfloor heating is better to use a traditional scheme – tie. The scheme of laying ceramic veneers: 1. logs 50 * 70, 2. Plywood WBP 18mm, 3. waterborne parquet glue, 4. 12mm plywood WBP, 5. Glue 2-hkomponentny parquet, 6. ceramic tile. Installation Recommendations: 1. Laghi pack increments not exceeding 400 mm, double-glued plywood will provide additional rigidity to the base, plywood, one layer does not suitable for the scheme, possible fracture of ceramic tiles in the joints. 2. For 2-hkomponentnogo on plywood substrate is not required, but for wet areas can be used, for example, Bona R-410. 3. Use dispenser (spatula with slots) on 850gr/kv.m that there was no extrusion of excess glue in the seam, but if it came out, then mechanically remove the next day a piece of cake. Pros of this scheme? 1. In houses with wooden beams, it is indispensable. 2. Minimum load Compared with screed. 3. Clay pottery is not only sticks to the plywood, but also acts as gidroizolyatora. 4. The adhesive is fast enough, the possibility of walking on packed ceramics after 30 minutes. 5. Grout joints Ceramic tile can be carried out on the same day. By the way, there was a new generation of parquet glue based on modified silane. It hardens in a chemical reaction with atmospheric moisture, as well as pulling it out base. Now is not the scary hit of glue on the front side, it is removed with a cloth without a trace, which is not the case with polyurethane. I would single out the main advantage of this glue – 'high residual elasticity of the adhesive joint,' he best suited for bonding wood and ceramics.

Ideal Best

Thus, it is possible to provide speed and direction in carrying out construction work. Building brick is one of the best materials to build a dwelling house, as it allows flexibility to organize the entire process of building and facade, which includes the following steps: 1. Preparatory phase – the basis of all subsequent operations. It is necessary because there is no reason to doubt it is important to prepare the building materials and site in general to construction of the house. With different variations, it usually involves a sequence of operations, ranging from the layout of the site and ending with the entrance device for vehicles with building materials. 2. Creating the foundation and construction of basement. One of the best reasons for an individual house is a solid foundation in the basis of which the iron-concrete beam.

Traditionally, however, the foundation is poured concrete, which also gives a strong and resistant to structural deformation. 3. Walling. The walls are recommended thickness of one brick, then coat the outside of specially designated for facing material. To create an internal walls ideal solution is to use ceramic bricks. 4. Creating a roof.

First, create a load-bearing portion of the trusses and frames, and then it is imposed from the sheathing boards and flooring. One of the most successful and practical solution is to use the attic space as another example, the labor room. In this case the ideal French roof, which has a gable bends. 5. Laying the roof. Leaky roof – it is not just bad form of construction, but less absolute masters at home. The roof, of course, must be waterproof, durable and lightweight maximum. From this point of view of coating of galvanized steel sheets will be a good solution and will serve at least 20 years. 6. Laying floors. Floors, in contrast to the roof will be in direct contact, and therefore it is important to ensure that they are good thermal insulation, strength and rigidity. As experience shows, double-layer wood floors – one of the best solutions in terms of thermal conductivity. 7. Decorating the walls. After cleaning the floors and ceilings can start finishing the walls that can be done in your individual style with applying gypsum board. By that list, perhaps you can add one more, of course, the creative stage, namely the arrangement of the courtyard and landscaping. Durable and stylish, it is best to create a track, using high-strength ceramic or clinker brick. With this decision, they serve faithfully and not only you but also your grandchildren.

Construction Of Apartment Houses. Integrated Approach

Construction of apartment buildings can provide housing for many people. For comparison, if a one-story shack there is a place only for 1-3 families, in the same area, but actually in an apartment house accommodate about 150-200 people, to create comfortable living conditions for 20-25 families. The architectural appearance of almost every major city is changing with regular consistency: twenty years ago, wooden hovel, yesterday – classic five-story building, now – pleasing to the eye and comfortable high-rise buildings. It is significant, but this trend is relevant not only for Moscow but for small towns where there is a shortage of housing due to increase in the population. Experience has shown that rapidly solve the problem can be voiced only by the construction of apartment houses and, in particular, the elimination of old housing and build high-rise increase the area of the sleeping areas, a point of central part of the city can not but rejoice that in the construction of apartment buildings are actively used in practice modern construction and finishing materials and technologies that reduce construction costs. Quality homes at the same time does not change.

Thus, conducting construction in Saratov, Samara, the capital city, any city, developers are less likely to seek assistance to contractors, and full use of their manufacturing capabilities, combined in diversified holdings. For solid construction companies today have become the norm not only experience in providing services general contractor, but also its own production base, producing reinforced concrete, reinforced concrete structures, piles, concrete and other building materials, modern plastic windows, etc. Of course, this Globalization deserves applause only: with the housing shortage problem is solved (by the appearance of new jobs), the problem of employment of citizens. An integrated approach to building high-rise buildings can effectively solve another problem – namely, the availability of one square meter. This is especially true for young families who do not have the money to buy their housing. If the construction company does not overpay for building materials, and applies to practice their own resources, independently carries out the sale of apartments, is engaged in the letting of commercial property – it is profitable not only for the construction company, but for buyers of housing. By the way, to work with diversified holdings brand building and cost-effective and business structures: the cost of renting commercial property from the developer on the order of less than searching sites for offices, shops, warehouse through a real estate agency.